Build
Connect & operate
Design & teams
Start hereScope a build in one callBring a spec, a wireframe, or a paragraph. You leave with an architecture, a timeline, and a number.Request a scoping call
AI software
LLM & data systems
Vibe coding
Ready to ship?Put AI where the work isAgents, RAG, and private LLMs wired into the systems your team already uses — not a chatbot bolted to a homepage.Discuss an AI project
Domain firstWe learn your workflow before we model itRegulated, operational, or high-volume — the constraints belong in the schema, not in a training doc.Talk about your domain
Graphic · Data Centers · 2026

Data Centers by State: Operating and Planned (2026)

Virginia runs 398 data centers and has 287 more in the pipeline, but the next wave is heading inland and to rural counties. The Build-Out Gap sets each state's pipeline against what it runs today.

Updated Nov 18, 20266 charts · 4 key stats4 primary sources
Fig. 1

The Build-Out Gap

States with the most data centers, Feb. 2026. The ring is what each state operates today; the solid dot adds every data center under construction, planned or land banked. The blue bar between them is the pipeline.

Operating Operating + planned Gap (Operating + planned − Operating)
0100200300400500600700GapVirginia398685+287Texas296466+170California277331+54Illinois139262+123Georgia94235+141Ohio166223+57Arizona98184+86New York148154+6Oregon115142+27Washington124135+11Pennsylvania78129+51Florida120128+8North Carolina72113+41Iowa64105+41Indiana3892+54

Top 15 states by total, as published by Pew Research Center from Data Center Map. Planned includes projects listed as under construction, planned or land banked; canceled and uncertain projects are excluded. Counts depend on the database: Aterio's tracker, which counts differently, puts Virginia at 320 operating sites and projects Texas (962 total sites) to pass Virginia (954).

Operating data centers in Virginia
398
Most of any state; Texas is next with 296
New U.S. data centers in development
1,500+
On top of more than 3,000 operating today
Planned data centers in rural areas
67%
vs. 13% of those operating today
Texas & Midwest share of new hyperscale capacity
53%
Up from 33% of operating capacity at end-2025
Fig. 2

Data centers use a quarter of Virginia's electricity

Data center electricity use by state, 2023, as a share of each state's total. Each square fills to that share on a 0–30% scale; the dashed line is the U.S. average of about 4%.

Fill: 0.00% (empty) to 30.00% (full) U.S. ≈4%
VA25.59%VA25.59%ND15.42%ND15.42%NE11.70%NE11.70%IA11.43%IA11.43%OR11.39%OR11.39%WY11.26%WY11.26%NV8.69%NV8.69%UT7.68%UT7.68%AZ7.43%AZ7.43%WA5.69%WA5.69%IL5.48%IL5.48%NJ5.42%NJ5.42%TX4.59%TX4.59%GA4.26%GA4.26%MT3.71%MT3.71%CA3.70%CA3.70%PA3.16%PA3.16%NY2.84%NY2.84%CO2.66%CO2.66%SC2.45%SC2.45%KY2.15%KY2.15%MA2.08%MA2.08%NC1.92%NC1.92%OK1.76%OK1.76%AL1.71%AL1.71%OH1.58%OH1.58%NM1.48%NM1.48%TN1.30%TN1.30%MN1.24%MN1.24%MO1.21%MO1.21%CT0.95%CT0.95%ID0.57%ID0.57%FL0.56%FL0.56%MI0.52%MI0.52%SD0.52%SD0.52%RI0.23%RI0.23%ME0.22%ME0.22%WI0.21%WI0.21%IN0.19%IN0.19%MD0.16%MD0.16%NH0.16%NH0.16%HI0.10%HI0.10%LA0.08%LA0.08%KS0.02%KS0.02%

EPRI estimates. Table A1 covers the 44 states with significant data center load in 2023; Alaska, Arkansas, Delaware, Mississippi, Vermont and West Virginia are not listed and are left blank. The U.S. figure is EPRI's "about 4%" average estimate.

Fig. 3

Virginia's data centers use more power than any other state's

Data center electricity use by state, top 15, 2023, terawatt-hours

Virginia33.85 TWhTexas21.81 TWhCalifornia9.33 TWhIllinois7.45 TWhOregon6.41 TWhArizona6.25 TWhIowa6.19 TWhGeorgia6.18 TWhWashington5.17 TWhPennsylvania4.59 TWhNew York4.07 TWhNew Jersey4.04 TWhNebraska3.96 TWhNorth Dakota3.92 TWhNevada3.42 TWh

EPRI estimates, converted by dev.co from MWh per year (33,851,122 MWh = 33.85 TWh). EPRI says these 15 states made up about 80% of national data center load in 2023.

Fig. 4

Georgia's pipeline is bigger than what it runs today

Planned data centers by state as a share of operating ones, Feb. 2026, top 15 states

Georgia150%Indiana142%Illinois88%Arizona88%Virginia72%Pennsylvania65%Iowa64%Texas57%North Carolina57%Ohio34%Oregon23%California19%Washington9%Florida7%New York4%

Calculated by dev.co: planned ÷ operating, from Pew's counts. Georgia has 141 planned vs. 94 operating; Indiana 54 vs. 38. New York (6 planned vs. 148 operating) has the smallest pipeline relative to its base.

Fig. 5

Nearly half of planned data centers are in the South

Planned data centers by U.S. Census region, Feb. 2026

48.5%26.9%17.8%
  • South75448.5%
  • Midwest41926.9%
  • West27717.8%
  • Northeast1066.8%
  • All planned1,556100%

The total is the sum of Pew's four regional counts (Pew rounds it to "more than 1,500"). The South includes Virginia, Texas and Georgia. Planned counts would raise each region's existing total by 62% (South), 64% (Midwest), 34% (West) and 26% (Northeast).

Fig. 6

Two-thirds of the next wave is going rural

Share of U.S. data centers in rural vs. urban areas, by status, Feb. 2026

RuralUrban
0%25%50%75%100%PlannedRural 67%Urban 33%Operating13%Urban 87%

Urban and rural follow U.S. Census Bureau definitions. Pew also found that 39% of planned data centers are in counties that have none today.

Free to republish

Add This Graphic to Your Website

Paste one snippet and every chart, stat and citation above appears on your page. It stays interactive and responsive, and it updates automatically when we revise the data.

  • All sources travel with every card
  • Resizes to fit any column width
  • Light or dark theme, full set or a single card
  • Free with attribution, which is built in
Share this graphic
<div class="graphic-embed" data-graphic="data-centers-by-state">
  <a href="https://dev.co/graphics/data-centers-by-state">Data Centers by State: Operating and Planned (2026)</a> by DEV.co
</div>
<script async src="https://dev.co/embed.js"></script>
Auto-resizes to fit its content. Works on WordPress, Webflow, Squarespace, Ghost and plain HTML.
Preview

Which state has the most data centers?

Virginia has the most data centers in the U.S., with 398 operating and 287 more planned as of February 2026, according to Pew Research Center's analysis of Data Center Map. Texas is second with 296 operating and 170 planned, followed by California (277 operating), Ohio (166) and New York (148). The Build-Out Gap in Figure 1 ranks the 15 states with the most data centers by their combined total and draws each state's pipeline as the blue bar between what it runs today and what it will run once every planned site opens.

How many data centers are in the U.S.?

The U.S. has more than 3,000 operating data centers and more than 1,500 in development, Pew found. Pew counts a data center as planned if it is listed as under construction, planned or land banked, and it drops projects marked canceled or uncertain. The four Census regions add up to 1,556 planned sites. Other trackers count differently, so state totals vary by source.

Where are new data centers being built?

Most new data centers are going to the South and Midwest, which together hold three-quarters of the U.S. pipeline. The South alone has 754 planned sites, 48% of the total. Georgia's 141 planned data centers would add 150% to its 94 operating ones, the largest jump of any top-15 state, and Indiana's pipeline (54) is also bigger than its base (38). Two-thirds (67%) of planned data centers are in rural areas, against 13% of those operating today, and 39% are in counties that have none yet.

The biggest sites point the same way. Synergy Research Group, which tracks 21 major cloud and internet companies, says Texas and the Midwest held 33% of operating U.S. hyperscale capacity at the end of 2025 but account for 53% of the capacity in its pipeline. It calls Texas "by a wide margin" the most prominent state in that pipeline, and names Wisconsin, Indiana, Michigan and Missouri as fast risers in the Midwest. The U.S. had 580 operating hyperscale data centers at the end of 2025 and 437 more in Synergy's pipeline.

How much electricity do data centers use by state?

Data centers used 25.59% of Virginia's electricity in 2023, about 33.85 terawatt-hours, according to EPRI estimates. That is more than six times the national share, which EPRI puts at about 4%. Five other states passed 10%: North Dakota (15.42%), Nebraska (11.70%), Iowa (11.43%), Oregon (11.39%) and Wyoming (11.26%). Texas has the second-largest data center load (21.81 TWh) but a much bigger grid, so data centers made up only 4.59% of its use. EPRI found that 15 states accounted for about 80% of national data center load.

Will Texas pass Virginia in data centers?

It depends on the tracker. In Pew's Data Center Map figures, Virginia leads Texas on both operating sites (398 vs. 296) and planned ones (287 vs. 170). Aterio, the data provider behind Visual Capitalist's ranking, counts differently: it projects Texas reaching 962 total sites across operating, under-construction and announced projects, ahead of Virginia's 954. Synergy says Northern Virginia will keep the single biggest concentration of hyperscale data centers, even as new capacity shifts toward Texas.

Methodology & caveats

There is no official count of U.S. data centers. Figures 1, 4, 5 and 6 and three of the stat tiles use Pew Research Center's analysis of Data Center Map, an industry database, as of February 19, 2026. Pew published the top 15 states only. A planned data center is one listed as under construction, planned or land banked; planned sites can be delayed or canceled, and a single campus may count as several data centers. Figure 4 (planned as a share of operating) and the 1,556 regional total were calculated by dev.co from Pew's counts.

Electricity figures (Figures 2 and 3) are EPRI estimates for 2023 from its May 2024 Powering Intelligence report, so they predate the 2025–2026 pipeline in the other cards. EPRI lists 44 states with significant data center load; the other six are left blank in Figure 2. Figure 3 converts EPRI's MWh per year to TWh. Synergy's shares measure hyperscale IT capacity for 21 large operators, not facility counts. Aterio's Texas and Virginia figures are cited via a reprint of Visual Capitalist's article because Aterio's own site could not be reached; they use a different database and definitions from Pew's, so the two sets of counts should not be mixed.

Sources

  1. [1]
    Pew Research Center. Most new data centers in the U.S. are coming to rural areas (Apr 13, 2026), analysis of Data Center Map data accessed Feb. 19, 2026https://www.pewresearch.org/short-reads/2026/04/13/most-new-data-centers-in-the-us-are-coming-to-rural-areas/
  2. [2]
    Aterio (via Visual Capitalist). Where the servers reside: Texas and Virginia lead data center boom (Visual Capitalist, reprinted in Real Assets Adviser, June 2026)https://irei.com/publications/article/where-the-servers-reside-texas-and-virginia-lead-data-center-boom/
  3. [3]
    Synergy Research Group. U.S. Hyperscale Investment Shifts Decisively Inland (Apr 13, 2026)https://www.srgresearch.com/articles/focus-of-us-hyperscale-investment-shifts-dramatically-inland
  4. [4]
    Electric Power Research Institute. Powering Intelligence: Analyzing Artificial Intelligence and Data Center Energy Consumption (May 2024): Table 2 and Table A1, 2023 data center load by statehttps://restservice.epri.com/publicdownload/000000003002028905/0/Product
Cite this graphicDEV.co. “Data Centers by State: Operating and Planned (2026).” DEV.co Graphics, updated 2026-11-18. https://dev.co/graphics/data-centers-by-state